mxbuilder®REHAB BUDGET
PROJECT INFO
ESTIMATED BUILD COST
$0.00
0 items selected
LINE ITEMS — toggle to include, slide to adjust grade (1=full · 9=10%)
#1Lot Clearing & Leveling
$1.50/SF
#2Plumbing, Storm
$11.40/SF
#3Foundation
$15.50/SF
#4Culver Street
$1.20/SF
#5Flatwork
$3.90/SF
#6Framing - Material
$22.50/SF
#7Framing - Labor
$8.60/SF
#8Windows
$3.90/SF
#9Doors
$5.10/SF
#10Roofing
$5.70/SF
#11HVAC
$8.70/SF
#12Electric T-Pole
$0.60/SF
#13Electric Rough/Final
$10.60/SF
#14Insulation
$2.40/SF
#15Drywall
$5.10/SF
#16Paint
$5.40/SF
#17Ceramic Tiles
$5.10/SF
#18Interior Trim
$2.70/SF
#19Flooring
$5.30/SF
#20Countertop
$4.50/SF
#21Landscaping
$3.40/SF
#22Cabinets
$5.10/SF
#23Fencing
$2.70/SF
#24Termite Treatment
$0.60/SF
#25Water/Electric Taps
$5.40/SF
#26Exterior Façade
$7.80/SF
#27Appliances
$3.60/SF
#28Garage
$1.20/SF
mxbuilder®
PROPOSAL
👤PROPOSAL TO:
📍PROJECT LOCATION:
LIVING AREA (SF):
REHAB BUDGET
(Estimated Build Cost)
$0.00
ITEM #DESCRIPTIONCOST / ITEMCOST PER SFBUDGET %
No items selected
TOTAL$0.00$0.00100.00%
📅
DATE OF SUBMISSION:
May 19, 2026
ℹ️
VALIDITY:
This proposal is valid for 30 days
from the date of submission.
SUBMITTED BY:
Eugenio Tamez
etamez@mx.group
832-326-1468
Eugenio Tamez
SIGNATURE
Thank you for the opportunity to provide our services.
We look forward to working with you.